Jump to the main content block

Publications (Professor Maw-Sheng Chern)

Go back to previous page

 

A. Publications:Journal Papers

  1. M.J. Magazine and Maw-Sheng Chern, “A Note on Approximation Schemes for Multidimensional Knapsack Problems,” Mathematics of Operations Research, Vol. 9, No. 2, 244-247 (1984).

  2. Maw-Sheng Chern and Hsien-Fen Wang, “Stochastic Programming Applied to Reliability Optimization Problems,” The Chinese Journal of Management Science, Vol. 1, No. 2, 61-67 (1984).

  3. Maw-Sheng Chern and Rong-Hong Jan, “Parametric Programming Applied to Reliability Optimization Problems,” IEEE Transactions on Reliability, Vol. R-34, No. 2, 165-170 (1985).

  4. Maw-Sheng Chern and Rong-Hong Jan, “Reliability Optimization Problems with Multiple Constraints,” IEEE Transactions on Reliability, Vol. R-35, No. 4, 431-436 (1986).

  5. G. H. Chen and Maw-Sheng Chern, “Parallel Generation of Permutations and Combinations,” BIT Vol. 26, No. 3, 277-283 (1986).

  6. G. H. Chen, Maw-Sheng Chern and R.C.T. Lee, “A New Systolic Architecture for Convex Hull and Half-plane Intersection Problems,” BIT, Vol. 27, No. 2, 141-147 (1987).

  7. G. H. Chen and Maw-Sheng Chern, “Designing Parallel Algorithms from Regular Graphs and Semi-regular Graphs,” Proceedings of the 1987 International Conference on Parallel Processing (Edited by Sartaj K. Sahni), 363-366, Pennsylvania State University Press U.S.A. (1987).

  8. G. H. Chen and Maw-Sheng Chern, “An LC Branch and Bound Algorithm for The Task Assignment Problem,” Bulletin of The College of Engineering, National Taiwan University, No. 41, 71-84 (1987).

  9. Chin-Cherh Chen, Maw-Sheng Chern and K. C. Lin, “Capacitated Multiple Products Inventory System,” Recent Development in Production Research (Editor: Anil Mital) 194-199, Elsevier Science Publishers B.V., Amsterdam (1988).

  10. Rong-Hong Jan and Maw-Sheng Chern, “System Reliability Design with Deteriorative Components,” Microelectronics and Reliability, Vol. 28, No. 1, 43-58 (1988).

  11. Maw-Sheng Chern, G. H. Chen and Pangfeng Liu, “An LC Branch and Bound Algorithm for Module Assignment Problem,” Information Processing Letter, Vol. 32, No. 2, 61-71 (1989).

  12. G. H. Chen and Maw-Sheng Chern, “A New Three-Stage Procedure for Parallel Algorithm Design,” International Journal of Mini and Microcomputers, Vol. 11, No. 3, 58-64 (1989).

  13. G. H. Chen, Maw-Sheng Chern and J. H. Jang, “Pipeline Architectures for Dynamic Programming Algorithms,” Parallel Computing, Vol. 13, No. 1, 111-117 (1990).

  14. Jyun-Jy Hu, Shi-Nine Yang, Maw-Sheng Chern and Cheng-Ming Weng, “An Efficient Distributed Selection Algorithm for General Tree Networks,” Proceedings of the 1990 International Conference on Parallel Processing, Vol. III, 348-349, Pennsylvania State University Press U.S.A. (1990).

  15. Wen-Hsien Tsai, Maw-Sheng Chern and T.-M. Lin, “An Algorithm for Determining Whether M Given Points are on a Hemisphere,” Transportation Science, Vol. 25, No. 1, 91-97 (1991).

  16. Maw-Sheng Chern, Rong-Hong Jan and Ren-Jer Chern, “Parametric Nonlinear Integer Programming: The Right-hand Side Case,” European Journal of Operational Research, Vol. 54, No. 2, 237-255 (1991).

  17. Maw-Sheng Chern, K.C. Lin and Chin-Cherh Chen, “A Heuristic Algorithm for the Deterministic Multi-Item Inventory System with Capacity Constraint,” Journal of the Operations Research Society of Japan, Vol. 34, No.1, 1-12 (1991).

  18. G. H. Chen and Maw-Sheng Chern, “Synthesis of Algorithms on Processor Arrays,” Parallel Computing, Vol. 17, No. 3, 279-284 (1991).

  19. Lih-Hsing Hsu, Rong-Hong Jan, Yu-Che Lee, Chun-Nan Hung and Maw-Sheng Chern, “Finding the Most Vital Edge with Respect to Minimum Spanning Tree in Weighted Graphs,” Information Processing Letters, Vol. 39, No. 5, 277-282 (1991).

  20. Maw-Sheng Chern, “On the Computational Complexity of Reliability Redundancy Allocation in a Series System,” Operations Research Letters, Vol. 11, No. 5, 309-315 (1992).

  21. G. H. Chen, Maw-Sheng Chern, “A Pipelined Algorithm for Multiple-choice 0/1 Knapsack Problem,” International Journal of High Speed Computing, Vol. 4, No. 1, 43-48 (1992).

  22. Rong-Hong Jan and Maw-Sheng Chern, “Nonlinear Integer Bi-level Programming,” European Journal of Operational Research, Vol. 72, pp. 574-587 (1994).

  23. Kao-Cheng Lin and Maw-Sheng Chern, “The Most Vital Edges in the Minimum Spanning Tree Problem,” Information Processing Letters, Vol. 45, No. 1, 25-31 (1993).

  24. Jyun-Jy Hu, Shi-Nine Yang and Maw-Sheng Chern, “Network Partition and its Application to Distributed Selection Problem,” Network, Vol. 23, 299-308 (1993).

  25. Kao-Cheng Lin and Maw-Sheng Chern, “The Fuzzy Shortest Path Problem and its Most Vital Arcs,” Fuzzy Sets and System, Vol. 58, 343-353 (1993).

  26. Kao-Cheng Lin and Maw-Sheng Chern, “Increasing the Minimum Value of a Linear Program - A Parametric Analysis,” The Chinese Journal of Management Science, Vol. 10, No. 2, 245-259 (1993).

  27. Kao-Cheng Lin and Maw-Sheng Chern, “The Single Most Vital Arc in The Most Economical Path Problem - A Parametric Analysis,” Computers and Operations Research, Vol. 21, No. 3, 353-358, (1994).

  28. Kao-Cheng Lin and Maw-Sheng Chern, “Finding the Most Vital Arc in the Shortest Path Problem with Fuzzy Arc Lengths,” in Multiple Criteria Decision Making: Expand and Enrich the Domains of Thinking and Applications, Springer Verlag.

  29. Maw-Sheng Chern and Kao-Cheng Lin, “Interdicting The Activities of A Linear Program - A Parametric Analysis,” European Journal of Operational Research, Vol.86, No. 2, 580-591 (1995).

  30. Dar-Li Yang and Maw-Sheng Chern, “A Two-Machine Flowshop Sequencing Problem with Limited Waiting Time Constraints,” Computers and Industrial Engineering, Vol. 28, 63-70 (1995).

  31. Dar-Li Yang and Maw-Sheng Chern, “A Scheduling Problem with Reprocessing Operations- A Case study,” The Chinese Journal of Management, Vol. 14, No. 1, 136-154 (1997).

  32. Maw-Sheng Chern and Dar-Li Yang, “A Branch-and-bound Algorithm for the Two-Machine Sequencing Problem with Reprocessing Operations,” Journal of the Chinese Institute of Industrial Engineers, Vol. 12, No.1, pp. 55-61 (1995).

  33. Dar-Li Yang and Maw-Sheng Chern, “A Two-stage Multi-batch Flowshop Batch Processing Scheduling Problem,” Journal of Nankai, 2, 285-296 (1997).

  34. Maw-Sheng Chern, Liang-Yuh Ouyang and Jinn-Tsai Teng, “Price-production Decisions under Various Optimizing Criteria in an Oligopolistic Market,” International Journal of Information and Management Sciences, Vol. 8, No. 2, 9-18 (1997).

  35. Jinn-Tsai Teng, Maw-Sheng Chern and Hui-Ling Yang, “An Optimal Recursive Method for Various Inventory Replenishment Methods with Increasing Demand and Shortages,” Naval Research Logistics, 44, 791-806 (1997).

  36. Dar-Li Yang, Maw-Sheng Chern and Jung-Te Wang, “A two-machine multi-family flowshop batch processing scheduling problem with the total completion time case,” International Journal of Quantitative Management, Vol. 4, No. 3, 315-325 (1998).

  37. Jinn-Tsai Teng, Maw-Sheng Chern and Hui-Ling Yang, “Deterministic lot-size inventory models with shortages and deterioration for fluctuating demand,” Operations Research Letter, Vol. 24, pp. 65-72 (1999).

  38. Dar-Li Yang and Maw-Sheng Chern, “A generalized two-machine flowshop scheduling problem with processing time linearly dependent on job waiting time,” Computers and Industrial Engineering (special issue on computational intelligence for industrial engineering), Vol. 36, 365-378 (1999).

  39. Jinn-Tsai Teng, Maw-Sheng Chern and Hui-Ling Yang, “Deterministic lot-size inventory models with shortages and deterioration for fluctuating demand,” Operations Research Letter, Vol. 24, pp. 65-72 (1999).

  40. Hui-Ling Yang and Maw-Sheng Chern, “Capacitated inventory replenishment policy with linear trend demand,” Journal of the Chinese Institute of Industrial Engineers, Vol. 16, No. 3, pp. 419-431 (1999).

  41. Dar-Li Yang and Maw-Sheng Chern, “Two-machine flowshop group scheduling problem,” Computers and Operations Research, Vol. 27, 975-985 (2000).

  42. Jung-Te Wang, Maw-Sheng Chern and Dar-Li Yang, “A Two-machine Multi-family Flowshop Scheduling Problem with Two Batch Processors,” Journal of the Chinese Industrial Engineers, Vol. 18, No. 3, 77-85 (2001).

  43. Jinn-Tsai Teng, Maw-Sheng Chern and K. H. Kim, “Entry Strategies for Host Country and Multinational Enterprises,” European Journal of Operational Research, Vol. 133, pp. 62-68 (2001).

  44. Maw-Sheng Chern, Jinn-Tsai Teng and Hui-Ling Yang, “Inventory Lot-size Policies for the Bass Diffusion Demand Models of New Durable Products,” Journal of the Chinese Institute of Engineers, Vol. 24, No. 2, 237-244 (2001).

  45. Hui-Ling Yang, Jinn-Tsai Teng and Maw-Sheng Chern, “Deterministic Inventory Lot-size Models under Inflation with Shortages and Deterioration for Fluctuating Demand,” Naval Research Logistics, 48, 144-158 (2001).

  46. Dar-Li Yang, Maw-Sheng Chern and Jung-Te Wang, “A Two-machine Multi-family Flowshop Batch Processing Scheduling Problem with Application to Testing Process,” International Journal of Industrial Engineering, 8(4), 289-298 (2001).

  47. Dar-Li Yang, Ching-Lien Hung, Chou-Jung Hsu and Maw-Sheng Chern, “Minimizing the Makespan in a Single Machine Scheduling Problem with a Flexible Maintenance,” Journal of the Chinese Institute of Industrial Engineers, 19, No. 1, 63-66 (2002).

  48. Hui-Ling Yang, Maw-Sheng Chern and Jinn-Tsai Teng, “A forward recursive algorithm for inventory lot size models with power-form demand and shortages,” European Journal of Operational Research, 137, 394-400 (2002).

  49. Maw-Sheng Chern, Jinn-Tsair Teng and Ya-Lan Chan, “A comparison among various inventory shortage models for deteriorating items on the basis of maximizing profit,” Asia Pacific Journal of Operational Research, Vol. 22, No. 1, 121-134 (2005).

  50. Jinn-Tsair Teng, Maw-Sheng Chern and Ya-Lan Chang, “Deterministic Inventory Lot-size models with shortages for fluctuating demand and unit purchase cost,” International Transactions in Operational Research, Vol. 12, Iss. 1, 83-100 (2005).

  51. Rong-Hong Jan, Ching-Peng Lin and Maw-Sheng Chern, “An Optimization Model for Web Content Adaption,” Computer Network, 50, 953-965 (2006).

  52. Chou-Jung Hsu, Wen-Hung Kuo, Dar-Li Yang and Maw-Sheng Chern, “Minmizing the makespan in a two-stage flowshop scheduling problem with a function constraint on alternative machines,” Journal of Marine Science and Technology, 14, No. 4, 213-217 (2006) (EI).

  53. Jinn-Tsair Teng, Chun-Tao Chang, Maw-Sheng Chern and Ya-Lan Chan, “Retailer's Optimal Ordering Policies with Trade Credit Financing,” International Journal of Systems Science, Vol. 38, 269-278 (2007).

  54. Maw-Sheng Chern, Hui-Ling Yang, Jinn-Tsair Teng, and S. Papachristos. “Partial Backlogging Inventory Lot-size Models for Deteriorating Items with Fluctuating Demand under Inflation,” European Journal of Operational Research, Vol. 191, 125-139 (2008).

  55. Dar-Li Yang, Wen-Hung Kuo and Maw-Sheng Chern, Multi-family scheduling in a two-machine reentrant flow shop with setups, European Journal of Operational Research 187, No.3, 1160-1170 (2008).

  56. Hui-Ling Yang,, Jinn-Tsair Teng, and Maw-Sheng Chern, “An inventory model under inflation for deteriorating items with stock-dependent consumption rate and partial backlogging shortages,”  International Journal of Production Economics, Vol. 123, 8-19 (2010).

  57. Chun-Tao Chang, Jinn-Tsai Teng, and Maw-Sheng Chern, Optimal manufacturer’s replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits, To appear in International Journal of Production Economics (2010).

  58. Jinn-Tsair Teng, Hui-Ling Yang, and Maw-Sheng Chern, Eonomic Order Quantity Models for Deteriorating Items and Partial Backlogging When Demand is Quadratic in Time, To appear in European Journal of Industrial Engineering (2010).

  59. Jinn-Tsair Teng, and Maw-Sheng Chern. (2009), “Seller’s optimal credit period and order quantity when credit period has a positive impact on demand while negative impacts on costs and default risks,” Submitted to International Journal of Production Economics..

  60. Dar-Li Yang and Maw-Sheng Chern, “Minimizing the makespan in a two-machine flowshop scheduling problem with processing time linearly dependent on job waiting-time,” Submitted to Naval Research Logistics.

  61. Jinn-Tsair Teng, Chun-Tao Chang, and Maw-Sheng Chern, “Supple chain vendor-buyer inventory models with trade credit financing under a non-cooperative and an integrated environments,” Submitted to International Journal of Production Economics.

  62. Maw-Sheng Chern, Jinn-Tsair Teng, and Suresh Kumar Goyal. “Nash equilibrium solutions in vendor-buyer supply chain models with permissible delay in payments,” Submitted to European Journal of Operational Research.

  63. Hui-Ling Yang, Jinn-Tsair Teng, Maw-Sheng Chern. “An inventory model under inflation for deteriorating items with stock-dependent consumption rate and partial backlogging shortages,” Submitted to International Journal of Production Economics, Volume 123, Issue 1, January 2010, Pages 8-19

  64. Chun-Tao Chang, Jinn-Tsair Teng, Maw-Sheng Chern. “Optimal manufacturer’s replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits,” Submitted to International Journal of Production Economics, Volume 127, Issue 1, September 2010, Pages 197-202
     

B. Publications:Conference Papers

  1. Maw-Sheng Chern and Dar-Li Yang (1995), “A Branch-and-Bound Algorithm for the Two- Machine Multi-batch Scheduling Problem with Reprocessing Operations,” 1995 TIMS Conference, Singapore (Section Chair).

  2. Maw-Sheng Chern and Dar-Li Yang (1995), “On the Computational Complexity of Two-machine Flowshop Scheduling Problem with Processing Times Linearly Dependent on Delay Times,” Proceedings of 1995 International Conference of Computers and Industrial Engineering, Shunghai (Invited Plenary Speaker).

  3. Dar-Li Yang and Maw-Sheng Chern (1996), “A generalized two-machine flowshop scheduling problem with processing time linearly dependent on job waiting-time,” Proceedings of the CIIE Conference, 381-390, Taipei.

  4. Dar-Li Yang and Maw-Sheng Chern (1997), “A Flowshop Batch Processing Scheduling Problem with Non-identical Job Sizes (I) - the Makespan Case,” Proceedings of the CIIE Conference, 65-70, Kaosiung, Taiwan, ROC.

  5. Dar-Li Yang and Maw-Sheng Chern (1997), “A Flowshop Batch Processing Scheduling Problem with Non-identical Job Sizes (II) - the Total Completion Time Case,” Proceedings of the CIIE Conference, 36-39, Kaosiung, Taiwan, ROC.

  6. Dar-Li Yang, Maw-Sheng Chern and Jung-Te Wang (1998), “A two-machine multi-family flowshop batch processing scheduling problem with the total completion time case,” International Conference of Quantitative Management Techniques and Applications, 385-396, Tainan.

  7. Dar-Li Yang and Maw-Sheng Chern (1998), “A Two-machine Flowshop Scheduling Problem with an Availability Constraint,” The1998 CIIE Conference, 129-134, Changhua, Taiwan, ROC.

  8. Jinn-Tsair Teng and Maw-Sheng Chern, “Backward & Forward Recursive Algorithms for Inventory Lot-Size Models with Power-Form Demand,” INFORMS meeting 1998, Seatle, SD38.3.

  9. Maw-Sheng Chern, Tse-Wei Yu and Dar-Li Yang (1999), “A Two-stage Multi-family Flowshop Scheduling Problem with A Common Machine,” The 15th Triennial Conference: The International Federation of Operational Research Societies, Beijing, China, July. (Section Chair)

  10. Maw-Sheng Chern, Dar-Li Yang and Jung-Te Wang (1999), “A Two-stage Multi-family Flowshop Scheduling problem with Parallel Batch Processors,” The 1999 Conference on Production Scheduling: Theory and Its Applications, Hsinchu, Taiwan. (Confernece Chair)

  11. Dar-Li Yang, Maw-Sheng Chern and Jung-Te Wang (2000), “A Two-machine Multi-family Flowshop Batch Scheduling Problem with Application to Testing Process of Semiconductor Manufacturing,” The 5th Annual International Conference on Industrial Engineering - Theory, Applications, and Practice,  Hsinchu, Taiwan, ROC, December. (Conference Program Chair)

  12. Jinn-Tsai Teng, Maw-Sheng Chern and Ya-Lan Chan (2000), “Deterministic Inventory Lot-size Models with Shortages for Fluctuating Demand and Unit Purchase Cost,” The 5th Annual International Conference on Industrial Engineering - Theory, Applications, and Practice, Hsinchu, Taiwan, ROC, December. (Conference Program Chair)

  13. Dar-Li Yang, Ching-Lien Hung, Chou-Jung Hsu and Maw-Sheng Chern (2000), “Minimizing the Makespan in a Single Machine Scheduling Problem with a Flexible Maintenance,”The 5th Annual International Conference on Industrial Engineering - Theory, Applications, and Practice, Hsinchu, Taiwan, ROC, December. (Conference Program Chair)

  14. Hui-Ling Yang, Jinn-Tsai Teng and Maw-Sheng Chern (2000), “A Forward Recursive Algorithm for Inventory Lot Size Models with Power-form Demand and Shortages,” International Conference of Optimization and Optimal Control, June 1-4, National Cheng Kung University, Tainan, Taiwan. (Committee Member and Section Chair)

  15. Jinn-Tsair Teng and Maw-Sheng Chern, “Inventory Models for Deteriorating Items & Stock-Dependent Demand,” INFORMS Miami 2001 Annual Meeting Session MD45.

  16. Dar-Li Yang, Chou-Jung Hsu, Ching-Lien Hung and Maw-Sheng Chern (2001), “Minimizing the makespan in a two-machine flowshop scheduling problem with proceedings time linearly dependent on job waiting-time,” The 2001 CIIE Conference, Kaosiung.

  17. Jinn-Tsair Teng, Maw-Sheng Chern and Ya-Lan Chang (2002), “Deterministic Inventory Lot-size models with shortages for fluctuating demand and unit purchase cost,” The 2nd McMaster Optimization Conference: Theory and Applications, McMaster, Canada.

  18. Dar-Li Yang, Chou-Jung Hsu, Ching-Lien Hung and Maw-Sheng Chern (2003), “Minimizing the makespan in a single machine scheduling with flexible maintenance and learning effect,” The 2003 CIIE Conference, Changhua.

  19. Chou-Jung Hsu, Ching-Lien Hung, Dar-Li Yang and Maw-Sheng Chern (2003), “Minimizing the makespan in a single machine scheduling problem with two maintenance stratagems,” The 2003 CIIE Conference, Changhua.

  20. Chou-Jung Hsu, Wen-Hung Kuo, Dar-Li Yang and Maw-Sheng Chern (2004),Minmizing the makespan in a two-stage flowshop scheduling problem with alternative machines,” The 2004 CIIE Conference, Tainan.

  21. Dar-Li Yang, Wen-Hung Ko and Maw-Sheng Chern (2005), “Minimizing the makespan in single-machine scheduling with a general time dependent learning effect,” 第三屆流通與全球運籌論文研討會, 台中.

  22. Dar-Li Yang, Wen-Hung Ko and Maw-Sheng Chern (2005), “A note on single-machine scheduling with a time-dependent learning effect to minimizing the maximum lateness,” The 2005 CIIE Conference, Hsinchu.

  23. Maw-Sheng Chern and Hung Ching Huang (2006), “A new genetic algorithm for solving the 0-1 multidimensional knapsack problem,” MOPTA 06 The 6th McMaster Optimization Conference: Theory and Applications, Waterloo, Canada.

  24. Teng, J. T., Chang, C. T., Chern, M. S., and Chan, Y. L. (2007), “Retailer’s optimal ordering policies with trade credit financing,The 2007 International Conference in Management Sciences and Decision Making in Taiwan, Taipei.

  25. Maw-Sheng Chern and Chin-Jung Lin (2009), A Genetic Algorithm for Solving Large-Scale Non-Linear Multi- dimensional Knapsack Problem, 2009 CORE-INFORMS Joint International Meeting, Toronto, Canada.

TOP

 

Click Num:
Login Success